Last OVR train to go to Sun-Rype. This was the main track to the Kelowna yard. 2048x1536 nec01.jpg |
Corn syrup car on end of train 2048x1536 nec02.jpg |
Section of track removed. 2048x1536 nec04.jpg |
Sun-Rype track still in place waiting for car to arrive. 2048x1536 nec06.jpg |
Track to yard removed while new sewer pipe installed on Sunday Sept. 11 05. 2048x1536 nec03.jpg |
Later Sunday, track reinstalled for trains Monday morning. 2048x1536 nec07.jpg |
New cement road way sections 2048x1536 nec05.jpg |
Looking north to Mile 118. Ties for new #10 switch layed out. 2048x1536 nec08.jpg |
New 115Lb. track section being prepared. 2048x1536 nec09.jpg |
Switch kit in a box 2048x1536 nec10.jpg |
#10 switch being assembled. 2048x1536 nec11.jpg |
Gordon Drive track removed. 2048x1536 nec12.jpg |
| | | |